Solutions / Cooling towers

    Scale management for cooling towers

    If scale keeps building up and the tower needs repeated cleaning, we assess whether HydroFlux changes deposit behavior and ease of removal. A site trial measures the result under your operating conditions.

    01 / The application

    What a cooling tower trial can assess

    Deposit behavior
    A nine-day pilot reported softer, more easily removed deposits on the treated tube
    Cleaning needs
    A site trial checks how deposits accumulate and how easily they can be removed
    Water use
    Any change in water use or blowdown needs separate measurement under your operating conditions

    02 / Nine-day pilot

    Deposit comparison

    Treated Specimen

    Softer, removable deposits

    Deposits could be removed with light mechanical action

    Control Specimen

    Harder to remove

    Deposits adhered more strongly to the untreated tube

    03 / Validation

    What we measure

    We review your water chemistry, deposits and cleaning history before agreeing on trial measures. Your water treatment team controls operating and treatment changes.

    1. Deposit buildup and ease of removal
    2. Cleaning frequency and equipment condition
    3. Water use and blowdown volume
    4. Water chemistry and treatment records
    5. Cooling performance, where it can be measured reliably

    Evaluate for your system

    Tell us where scale builds up and how often you clean it. We review the system and agree on useful trial measures.