Solutions / Cooling towers
Scale management for cooling towers
If scale keeps building up and the tower needs repeated cleaning, we assess whether HydroFlux changes deposit behavior and ease of removal. A site trial measures the result under your operating conditions.
01 / The application
What a cooling tower trial can assess
- Deposit behavior
- A nine-day pilot reported softer, more easily removed deposits on the treated tube
- Cleaning needs
- A site trial checks how deposits accumulate and how easily they can be removed
- Water use
- Any change in water use or blowdown needs separate measurement under your operating conditions
02 / Nine-day pilot
Deposit comparison
Treated Specimen
Softer, removable deposits
Deposits could be removed with light mechanical action
Control Specimen
Harder to remove
Deposits adhered more strongly to the untreated tube
03 / Validation
What we measure
We review your water chemistry, deposits and cleaning history before agreeing on trial measures. Your water treatment team controls operating and treatment changes.
- Deposit buildup and ease of removal
- Cleaning frequency and equipment condition
- Water use and blowdown volume
- Water chemistry and treatment records
- Cooling performance, where it can be measured reliably
Evaluate for your system
Tell us where scale builds up and how often you clean it. We review the system and agree on useful trial measures.
