Discuss your system

    Tell us what you're seeing

    Describe the iron fouling, cooling tower scale or repeated cleaning you are dealing with. We'll review whether HydroFlux could help and how to measure the result.

    01 / Get in touch

    Start with the problem

    A name, work email, company and a few words about what's happening is enough to start. If you have system details to hand, you can add them, but they can wait.

    What happens next

    1. 1 /We review the problem you describe
    2. 2 /We tell you what information is missing, such as system type, filtration, flow and water data
    3. 3 /We tell you whether a technical assessment makes sense
    4. 4 /Together we define a trial scope and measures of success
    Add system detailsOptional
    Current issues

    Results vary by installation. Site-specific configuration required.

    02 / If an assessment makes sense

    What a technical assessment covers

    1. Site survey

      We check pipe material, available space and access to a suitable installation point.
    2. Baseline review

      We review water tests, deposits and service records. We distinguish iron fouling from mineral scale before choosing trial measures.
    3. System mapping

      We review flow, pressure and the treatment location. For iron capture, we also check filtration and where filtered water returns.
    4. Success measures

      We agree what to measure and what would count as success. We plan comparisons and record other operating changes.
    5. Install plan

      We coordinate access, scheduling, and equipment delivery with your team. Any pump, filter or piping work is scoped separately.
    6. Proposal

      You receive a clear scope, an outline of the installation and agreed success measures for your team to review.