LAX Terminal 5
Ten-month field study in the LAX Central Utility Plant chilled water system to evaluate iron removal, filtration impact, and operational outcomes.
- System
- Closed-loop chilled water
- Location
- LAX Central Utility Plant
- Duration
- 10 months
- Measurement
- Flow-normalized filter mass + Fe ppm
In short
01 / The challenge
Why it mattered
The field report describes iron deposits affecting chilled water equipment and increasing cleaning needs. The project tested magnetic treatment with side-stream filtration.
02 / Results
Key outcomes
- Lower sampled iron
- 87%
- June–December 2024 comparison
- Sampled iron, ppm
- 3.9→0.51
- Later readings were higher
- Selected captured-mass tests
- +9.1%
- Study duration
- 10 mo
Source: HydroFlux field report and customer-reported iron readings. Flow, filter placement and other operating changes limit the conclusions.
03 / Field evidence
What we found



04 / Methodology and impact
Test setup
Bracelets were installed on side-stream filtration. Filters were weighed and flow was recorded, but leg placement and conditions were unequal.
What the study produced
- Captured iron-rich material in side-stream filtration
- Established site measures for iron and filter loading
- Identified improvements for later comparison protocols
Read the full report
Request the PDF for methodology, photos, and complete results.